Due to the expansion of land development within the area Tauranga City Council required an additional stormwater retention pond in order to accommodate increased stormwater flows. The brief set forth by the Council was to provide geotechnical inputs and design of the attenuation pond within a narrow gully feature surrounded by existing semi- rural residential properties.
CMW carried out ground investigations, detailed design of the pond and downstream embankment structures in order to formalise the final design.
Several machine and hand auger boreholes, together with cone penetrometer tests (CPT’s), were drilled in order to confirm soil strength parameters and develop a detailed ground model for the site. From this model various issues were considered for the design including:
The nature of the landform and associated risks resulted in a challenge in terms of completing the design within the required timeframes. CMW were able to assist with providing a satisfactory design and efficient construction.