The Bay of Plenty Regional Council (BOPRC) has an ongoing programme of reviewing the stopbanks on the Rangitaiki River and floodway, located in Edgecumbe, NZ. Investigations and remedial works have been prioritised following recent flood events.
The BOPRC requested that CMW assess the ability of the stopbanks (at the identified locations) to withstand a flood event with the identified return period. Results and recommendations were presented in a report which BOPRC require to help establish the details of a forward works programme of stopbank improvements (maintenance) and construction details of capital works (floodway).
CMW carried out a geotechnical investigation of the required areas comprising of:
This project required close planning and communication with BOPRC in order to meet their requirements.
Detailed review of previous geotechnical analyses completed in the area was undertaken in order to assess the remaining reaches and corroborate CMW’s own data.
The subsoils encountered varied significantly across the site due to the alluvial nature of their deposition as well as past and current land use activities. This variability resulted in complex seepage analysis results and careful consideration was required when determining remedial options and recommendations.