CMW was engaged as sub-consultant to Aurecon for a package of work for Main Roads WA which included a 12km extension of the Mitchell Freeway north of Perth from Burns Beach Road to Romeo Road, a 3km extension of Neerabup Road, various underpasses, intersections and interchanges as part of the overall scheme.
CMW carried out a geotechnical investigation that incorporated the following:
The investigation and reporting was required over a relatively short time frame and, as such, multiple drilling rigs were required to ensure timely completion. In addition, access and environmental constraints, related to protected flora, had to be carefully considered when planning and executing the investigation.
Potential geohazards that were identified for this development were material variability, loose sand zones, pinnacle limestone and karst features.
These hazards had to be carefully considered in foundation and cut slope design recommendations. Practical advice for earthworks, subgrade preparation, stormwater management and construction process were provided to help mitigate the risks associated with the geohazards identified.