Kings Square precinct is formerly the Perth Entertainment Centre site on Wellington Street next to the bus station and railway station. It forms part of the Perth City Link project, an urban renewal and redevelopment by Metropolitan Redevelopment Authority, with the intention to enhance vibrancy by connecting Perth city centre and Northbridge.
Kings square precinct is packaged into seven parcels of buildings construction each with basement car parks. The groundwater table is high with the presence of Acid Sulphate Soils associated with the remnant of the lake system in that area.
CMW carried out retaining wall and foundation designs and testing for packages KS1, KS2 & KS4 as detailed below:
As the foundation and retaining wall designs were highly optimised, with large diameter bored piles and cantilevered secant pile walls in high ground water conditions, the construction works were closely monitored. Competent rock sockets and quality concrete were ensured with comprehensive pile testing program.
Monitoring of deflections of the retaining walls was carried out to calibrate the design performance of the wall.